Skip to main content

Table 2 General methods of the economic evaluation

From: The impact of a park refurbishment in a low socioeconomic area on physical activity: a cost-effectiveness study

Parameter

Method

Perspective

Local government perspective

Study design

Cost-effectiveness analysis

Monetary unit of measurement

Australian Dollars

Base year

2017

Unit of measurement of outcomes

Metabolic equivalent hours (MET-h) gained

Comparator

Control park, no refurbishment

Discounting

3%