Costs | TPC (n = 405) | TMI (n = 407) | combined (n = 408) | control (n = 409) |
---|---|---|---|---|
Variable | 40 (6) | 92 (22) | 65 (14) | 0 (0) |
Fixed | 17 (0) | 15 (0) | 15 (0) | 0 (0) |
   Development | 0 | 0 | 0 | 0 |
   Training | 0 | 0.95 | 0.58 | 0 |
   Implementation | 16.94 | 13.09 | 13.82 | 0 |
   Overhead | 0.16 | 1.45 | 0.98 | 0 |
Total | 57 (6) | 107 (22) | 80 (14) | 0 (0) |